Construction progress billing guides
Find worked examples for progress payment applications, continuation sheets, stored materials, change orders and retainage.
Construction Pay Application TemplatePrepare a contractor payment application with a cover certificate, a supporting schedule and signature fields.Progress Payment Application PDF GeneratorCreate a progress draw certificate PDF for subcontractor, GC, architect and notary signatures.Schedule of Values Excel TemplateConvert an estimate into an Excel Schedule of Values with prior work, current work, stored materials and line-level retention.Schedule of Values Continuation Sheet MakerGenerate a continuation sheet PDF that ties item-level draw values back to the cover certificate.Contractor Retainage CalculatorCalculate line-specific withholding, a step-down rate and partial release for a contractor progress draw.Stored Materials Draw CalculatorReconcile eligible stored materials without double-counting items moved into installed work.Subcontractor Progress Billing Invoice BuilderBuild an itemized progress billing package with a current payment request and accounting import.Change Order & Progress Draw ReconciliationTrack approved and pending changes alongside the SOV and reconcile revised contract value.HVAC Progress Billing TemplateBuild an HVAC draw for ductwork, equipment, controls and testing with separately tracked stored material.Electrical Progress Billing TemplatePrepare an electrical subcontractor draw with cost codes for rough-in, gear, feeders, devices and testing.Plumbing Progress Billing TemplateCreate a plumbing pay application covering underground work, rough-in, fixtures and inspections.Progress Payment Application ChecklistCheck project identifiers, certified balances, change approvals and signatures before sending a construction draw.Schedule of Values CSV Import GuidePaste a CSV or spreadsheet table of item codes, scope descriptions and billing amounts into the workbench.Partial Retainage Release on a Progress DrawRecord a contract-authorized partial release without losing the line-level balance owed.Prevent Overbilling on a Construction DrawFind SOV lines where prior work, this period’s work and stored materials exceed the approved scheduled amount.GC Accounting Import CSV for Progress BillingExport progress draw line data in integer cents for a construction accounting import or mapping sheet.
Frequently asked questions
Which guide should I start with?
Start with the Schedule of Values Excel guide if you have an estimate. Start with the pay application checklist if your scope and prior draw are already reconciled.