How to apply it
- Break out equipment, distribution, controls and commissioning.
- Maintain an invoice and location record for stored equipment.
- Align approved field changes with their ductwork, equipment or controls item codes.
Worked example
A rooftop unit can have a stored balance before setting. Once installed, transfer that amount into current work and clear it from the stored balance.